Status: Summer 2007 - 2010
Whistler Athletes Village
located in Cheakamus Lake Road
CME was involved in a large portion of the foundation and footing preparation, utility hookups, grading, and paving of the Whistler Athletes Village for the 2010 Olympic and Para-Olympic Winter Games. CME performed all of the following works on 75 percent of the housing used by the athletes of the 2010 Games.
Works Done Included the following:
- Lot grading: filling and compaction
- Excavation for footings and foundation preparation
- Backfill and Slab Preparation
- Perimeter Drain and Sump Installation
- Water, Sanitary, Hydro, Tel, District Energy, and Storm Services
- Curb and Gutter Install
- Paving